Earn €10,000 More
per MWp, Annually
SkyEye accurately forecasts your PV portfolio's production up to 60 minutes ahead. Intelligently adjust your intraday trading positions and maximize your returns
Conventional Forecasts Fall Short Where Real-Time Matters
Typical PV forecasts use NWP and satellite imagery, delivering reliable forecasts hours ahead. But real-time cloud movement can rapidly change generation, creating forecast errors that directly translate into costly imbalances.
Imbalance Costs
As the balance responsible party, you bear imbalance costs when local cloud cover causes generation to deviate from forecasts and planned positions.
Missed Trading Opportunities
When forecasts miss sudden output changes, positions are corrected after prices move. That's not trading; it's reacting.
Higher Resolution Forecasting
Satellite and weather models capture the wider picture, but SkyEye captures the local conditions directly above your panels, in near real-time. Exactly the specifics that enable optimal trading.
A Forecast Based on the Sky Above Your Plant
A SkyEye camerabox captures the sky above your plant, tracking cloud movement towards the panels to forecast production for the next 60 minutes – accuracy satellites cannot match.
- 0–60-Minute Horizon
Forecasts are delivered at 15-minute resolution, exactly the window to reduce exposure to imbalance penalties.
- Processed at the Edge
Images are processed on the camerabox itself and only the forecast is transmitted.
- Works with Your Existing Systems
Forecasts are delivered via API or Modbus to your trading platform or SCADA. No extra dashboards needed.

You Only Pay from What You Earn Extra
We begin with a pilot on two of your sites. During the pilot, you compare SkyEye against your current forecast using your own data and trading results. If you decide to extend SkyEye across your portfolio, our fee is a share of the measured improvement.
Portfolio size
≈ 30 000 MWh / year
Extra Potential
300 000 € /year
Compared to your current forecast
Our fee
a share of the measured benefit, with no upfront fee
Indicative potential of €10,000/MWp per year. You measure the real delta on two pilot assets in your own stack.
From Pilot to Portfolio
A typical pilot takes 30 days from installation to first results.
Installation at Two Sites
We supply, install and maintain the cameraboxes and host the software. Installation requires only a power supply and network connection and no changes to your systems.
Side-by-Side Comparison
SkyEye forecasts run alongside yours – you evaluate both against actual production and imbalance, using your own metrics.
Decision on Rollout
We review the results together. If the improvement justifies it, we agree terms for the rest of your portfolio.
Where SkyEye Adds the Most Value
The Last 0–60 Minutes
SkyEye performs best where ramp events are frequent
Powered by Mycroft Mind
Mycroft Mind is a Czech company that develops Machine Learning (ML) for the energy sector. The SkyEye forecast model is our own and is trained on data from each individual site.
Performance Data Available
We share accuracy metrics, including nMAE by forecast horizon, and during the pilot provide a direct comparison against your current forecast.